This black and white document features a lists of tasks that need to be completed in the 39 days before the rededication ceremony.

Physical Description

handwritten text on paper

Subject

Fort Hays State University, Ellis County (Kan.), Dedications, Buildings, Conservation & restoration, Remodeling

Rights

© University Archives, Forsyth Library, Fort Hays State University

Publisher

Digitized by Forsyth Digital Collections

Comments

For questions contact ScholarsRepository@fhsu.edu

Language

eng

Transcription

Completion Schedule - Notes 6/23/82 39 days Custer Hall Library Autust 17, 1982, Tues. Last full work day before Hall opens. Check existing electrical circuts. Sand blast fire place. Strip and refinish woodwork. Window sills. Mantle. Baseboars. S Doors. Repaint ceiling & walls. Strip and refinish library chairs & table. Prepare sub-floor and lay carpeting. Install scones from 3rd floor room done mantel. Install chandeliers. Install fans. Install cusions on window seat. Move in piano and library table. Install drapes. ?Remove planters. Remove vending machines and reinstall in pocket of W. lounge. Remove trophy case & reinstall w/ fireplace in W. lounge. Install floor flush convenience outlets. Repair insulation on two E. steam pipes. Install ne push-pull hdwr on S. entr. doors (Matched as closely as possible to existing hdwr on old Albertson Hall door now stored in old Univ. Power Plant.)